docs(ci): describe the desktop CI runner, not gitdan-ci #33
@@ -16,7 +16,7 @@ on:
|
||||
# cost and the evidence are in README's Development section.
|
||||
types: [opened, synchronize, reopened, edited]
|
||||
|
||||
# The desktop runner (gitdan#112) has few slots, and the compiler-backed
|
||||
# The desktop runner (gitdan#112) has exactly one slot (the `desktop` label, capacity 1), and the compiler-backed
|
||||
# suites below are multi-minute. A superseded run costs a slot in front of
|
||||
# somebody's build, so drop it.
|
||||
#
|
||||
@@ -47,7 +47,7 @@ jobs:
|
||||
# `mktemp -d` and want a cold target dir every time — a persistent cache
|
||||
# would make "did this run rebuild?" unanswerable, which is the question
|
||||
# restore-mtimes-selftest.sh exists to ask. So this job takes no share of
|
||||
# the shared CI cache disk budget.
|
||||
# the host's shared CI cache disk budget (ci_cache_reclaim).
|
||||
steps:
|
||||
- name: Checkout sources
|
||||
uses: actions/checkout@v4
|
||||
|
||||
@@ -719,7 +719,7 @@ its bare default; either restores the bug.
|
||||
run.** Gitea populates no `changes` field for a title-or-body edit, unlike
|
||||
GitHub, so the workflow cannot tell the edit that un-drafts a PR from an
|
||||
ordinary body PATCH — a closing-reference fix-up, say. The price is around
|
||||
**90 seconds** of a runner shared across four repos on two capacity slots: the
|
||||
**90 seconds** of a runner shared across several repos (one capacity-1 `desktop` slot now; measured on gitdan-ci's two): the
|
||||
last twelve non-skipped runs of this job, `started_at` to `completed_at` off
|
||||
the Actions API, are 83 s median over 77–106 s. `timeout-minutes: 20` is a
|
||||
ceiling for a hung suite, not a duration. It is also bounded: the workflow's
|
||||
|
||||
Reference in New Issue
Block a user